Features
Everything you need to protect your work.
Core Features
Lock it down before you swing
Legally binding. No excuses.
When they try to skip the bill
Your whole crew covered
Know where every dollar went
When Things Go Wrong
Client Won’t SignClient Won’t PayScope DisputeWork Without ApprovalCollections & LiensClient Damaged Your WorkPre-Existing IssuesPermit ProblemsSubcontractor DisputesCompare
vs Procorevs Buildertrendvs Jobbervs JoistSee all comparisons →Industries
Built for every trade.
Construction & Trades
General ContractorsMasonry & ConcreteWindows & DoorsSiding & ExteriorDemolitionFence InstallationDeck BuildingConcrete & PavingYou stripped the old roof and found rotted decking, damaged trusses, and no ice & water shield. The homeowner thinks “re-roof” covers everything. SealedScope makes sure every sheet of plywood and every flashing replacement is signed before the first bundle goes up.

You tear off old shingles and find 10+ sheets of rotted decking underneath. You can't shingle over mush, but the client insists the re-roof price should cover replacement plywood.
Flashing around chimneys, skylights, and valleys is rusted through. Proper step flashing and counter-flashing add time and material the original bid didn't include.
Client adds a ridge vent, extra vents, or wants to upgrade from 3-tab to architectural shingles after you've already ordered material and started tear-off.
Rotted OSB or plywood discovered after tear-off. Every bad sheet needs to come out and be replaced with new decking before underlayment goes down. Some jobs need 20+ sheets. Each one is extra material and labor.
Chimneys, skylights, pipe boots, and valley flashing all need proper replacement. Old lead jacks are cracked, skylight curbs are rotted, and chimney counter-flashing was never done right in the first place.
Client upgrades from 3-tab to architectural, from asphalt to impact-rated, or wants standing seam metal. Material and labor costs change significantly, and so does the installation timeline.
Attic has no ridge vent, insufficient soffit vents, or needs powered ventilation. Cutting a ridge, adding box vents, or installing an attic fan requires framing and flashing work not in the re-roof bid.
Fascia boards are rotted from years of gutter overflow. Drip edge is bent, missing, or the wrong profile. Replacing both before new gutters and shingles go on adds a full day of work.
No existing ice and water membrane in valleys, eaves, or around penetrations. Code now requires it, and the homeowner's insurance may too. Full membrane coverage costs more than standard felt.
Rotted decking? Bad flashing? Open SealedScope on the roof, describe the additional work, set the price per sheet or per repair, and snap photos of the damage before it gets covered up.
Send the change order to the homeowner via text or email. They see the photos, the scope, and the cost. They sign digitally. No stopping work to go knock on the door.
Every sheet of plywood, every flashing repair, and every material upgrade is documented and signed. The final invoice matches the documentation. No disputes.
Tear Off & Discover
Rotted decking, bad flashing, or damage
Document On-Roof
Photo + scope + price in SealedScope
Send to Homeowner
Text or email with one tap
Homeowner Signs
Digital signature in seconds
Continue Install
Shingle with full authorization
85%
of roof tear-offs reveal decking damage or flashing issues not visible from the ground
$11,000
average annual loss per roofing company from undocumented decking replacements and extras
3 min
average time to create, send, and get a change order signed with SealedScope
Join roofing crews who use SealedScope to document every sheet of decking, every flashing repair, and every material upgrade before it becomes a payment dispute. Free to start. No credit card.
Get Started FreeYour first 3 change orders are free. No strings attached.