SealedScope
Built for the Trades

Built for Countertop Pros Who Deal With Template Changes and Slab Surprises

The template was perfect. Then the client moved the sink location, added a waterfall edge, and picked a slab with more waste factor. None of that was in the original quote. SealedScope makes sure every slab upgrade and cutout change is signed before the first cut.

Countertop installation

Every countertop installer has been burned by this

🪨

Client picks a different slab at the yard after you quoted Level 1 granite. The new selection is Level 4 quartzite. Triple the material cost and harder to fabricate.

📐

Sink cutout changes from drop-in to undermount after templating. The edge profile changes, the support structure changes, and the plumber needs a different hookup.

They want a waterfall edge, an extended bar top, or an integrated backsplash added. Each addition means more slab material, more fabrication time, and more seams to match.

Change orders countertop pros deal with on every install

Slab & Material Upgrades

$1,500 - $8,000

Client upgrades from laminate to quartz, or from Level 1 granite to exotic marble or porcelain. Material cost per square foot can jump from $30 to $150+ with a single slab change.

Edge & Cutout Changes

$400 - $2,500

Waterfall edges, ogee profiles, undermount sink cutouts, or cooktop cutouts added after fabrication begins. Each modification requires re-templating and precision CNC cutting.

Cabinet Issues at Install

$300 - $1,500

Cabinets aren't level, aren't secured to the wall properly, or don't match the template dimensions. Countertop installer can't set the stone until the base is corrected.

Backsplash Addition

$600 - $3,000

Client wants a matching stone backsplash, full-height behind the range, or a waterfall return. Backsplash templating, fabrication, and install are a separate scope entirely.

Plumbing & Electrical Coordination

$200 - $800

Sink hookup doesn't match the new undermount dimensions, or the cooktop cutout requires moving a gas line. You can't set stone on top of misaligned rough-ins.

Seam Placement Changes

$300 - $1,200

Client doesn't want a seam where it needs to go structurally. Moving seam locations requires different slab cuts, sometimes a larger slab, and more precision at install.

Lock down every upgrade before the slab gets cut

1

Document the Change

Slab upgrade? Edge change? Open SealedScope, describe the modification, set the revised price, and note the fabrication impact.

2

Get It Signed

Send the change order via text or email. The client sees the cost difference and signs digitally before the stone is cut.

3

Fabricate with Confidence

Every slab upgrade, edge change, and cutout modification is documented and signed. The final invoice matches what was agreed to.

From template change to signed in minutes

Countertop Change Order Flow

1

Client Changes Scope

Slab upgrade, edge change, or cutout move

2

Document Change

Specs + price + impact in SealedScope

3

Send to Client

Text or email with one tap

4

Client Signs

Digital signature in seconds

5

Cut & Install

Fabricate with full authorization

The numbers don't lie

61%

of countertop installs have slab, edge, or cutout changes after the original template

$8,900

average annual loss per countertop company from undocumented upgrades and re-fabrication

3 min

average time to create, send, and get a change order signed with SealedScope

Stop losing money on slab surprises

Join countertop pros who use SealedScope to document every slab upgrade, edge change, and cutout modification before it becomes a fabrication loss. Free to start. No credit card.

Get Started Free

Your first 3 change orders are free. No strings attached.