Features
Everything you need to protect your work.
Core Features
Lock it down before you swing
Legally binding. No excuses.
When they try to skip the bill
Your whole crew covered
Know where every dollar went
When Things Go Wrong
Client Won’t SignClient Won’t PayScope DisputeWork Without ApprovalCollections & LiensClient Damaged Your WorkPre-Existing IssuesPermit ProblemsSubcontractor DisputesCompare
vs Procorevs Buildertrendvs Jobbervs JoistSee all comparisons →Industries
Built for every trade.
Construction & Trades
General ContractorsMasonry & ConcreteWindows & DoorsSiding & ExteriorDemolitionFence InstallationDeck BuildingConcrete & PavingThe template was perfect. Then the client moved the sink location, added a waterfall edge, and picked a slab with more waste factor. None of that was in the original quote. SealedScope makes sure every slab upgrade and cutout change is signed before the first cut.

Client picks a different slab at the yard after you quoted Level 1 granite. The new selection is Level 4 quartzite. Triple the material cost and harder to fabricate.
Sink cutout changes from drop-in to undermount after templating. The edge profile changes, the support structure changes, and the plumber needs a different hookup.
They want a waterfall edge, an extended bar top, or an integrated backsplash added. Each addition means more slab material, more fabrication time, and more seams to match.
Client upgrades from laminate to quartz, or from Level 1 granite to exotic marble or porcelain. Material cost per square foot can jump from $30 to $150+ with a single slab change.
Waterfall edges, ogee profiles, undermount sink cutouts, or cooktop cutouts added after fabrication begins. Each modification requires re-templating and precision CNC cutting.
Cabinets aren't level, aren't secured to the wall properly, or don't match the template dimensions. Countertop installer can't set the stone until the base is corrected.
Client wants a matching stone backsplash, full-height behind the range, or a waterfall return. Backsplash templating, fabrication, and install are a separate scope entirely.
Sink hookup doesn't match the new undermount dimensions, or the cooktop cutout requires moving a gas line. You can't set stone on top of misaligned rough-ins.
Client doesn't want a seam where it needs to go structurally. Moving seam locations requires different slab cuts, sometimes a larger slab, and more precision at install.
Slab upgrade? Edge change? Open SealedScope, describe the modification, set the revised price, and note the fabrication impact.
Send the change order via text or email. The client sees the cost difference and signs digitally before the stone is cut.
Every slab upgrade, edge change, and cutout modification is documented and signed. The final invoice matches what was agreed to.
Client Changes Scope
Slab upgrade, edge change, or cutout move
Document Change
Specs + price + impact in SealedScope
Send to Client
Text or email with one tap
Client Signs
Digital signature in seconds
Cut & Install
Fabricate with full authorization
61%
of countertop installs have slab, edge, or cutout changes after the original template
$8,900
average annual loss per countertop company from undocumented upgrades and re-fabrication
3 min
average time to create, send, and get a change order signed with SealedScope
Join countertop pros who use SealedScope to document every slab upgrade, edge change, and cutout modification before it becomes a fabrication loss. Free to start. No credit card.
Get Started FreeYour first 3 change orders are free. No strings attached.