Features
Everything you need to protect your work.
Core Features
Lock it down before you swing
Legally binding. No excuses.
When they try to skip the bill
Your whole crew covered
Know where every dollar went
When Things Go Wrong
Client Won’t SignClient Won’t PayScope DisputeWork Without ApprovalCollections & LiensClient Damaged Your WorkPre-Existing IssuesPermit ProblemsSubcontractor DisputesCompare
vs Procorevs Buildertrendvs Jobbervs JoistSee all comparisons →Industries
Built for every trade.
Construction & Trades
General ContractorsMasonry & ConcreteWindows & DoorsSiding & ExteriorDemolitionFence InstallationDeck BuildingConcrete & PavingYou tore out the old foundation and found rotten footings. The client agreed to fix it, until the invoice showed up. SealedScope makes sure every footing repair and material upgrade is signed before you mix a single batch.

You demo a block wall and discover the footing is cracked and undersized. The client says fix it, then claims the footing was 'part of the wall job' when you bill for it.
Homeowner upgrades from standard CMU to natural stone veneer mid-project. Material cost triples. They act shocked when the price changes.
You pour a slab and hit unexpected rock or buried debris that requires jackhammering and hauling. Client says that should have been included in the original bid.
Existing footings are cracked, undersized, or non-existent. You can't build on a bad foundation, but the client didn't budget for a new one.
Client swaps from standard block to cultured stone, natural stone veneer, or full brick after the project starts. Labor and material costs jump significantly.
Hit rock, old utilities, or buried concrete when excavating. Removal and disposal costs add up fast and were never in the original scope.
Retaining wall needs a French drain, weep holes, and waterproofing membrane behind it. Without proper drainage the wall will fail, but the client only bid the block.
Engineer requires rebar, grout-filled cores, or bond beams that weren't in the original plan. Code compliance adds steel, labor, and inspection time.
What started as tuckpointing turns into a full crown replacement, flue liner install, or rebuild from the roofline up. Deterioration is always worse than it looks from the ground.
Bad footing? Client wants stone instead of block? Open SealedScope, describe the scope change, set the new price, and snap photos of what you found.
Send the change order to your client via text or email. They review the scope, the cost impact, and sign digitally. No chasing them down.
Every footing repair, material upgrade, and hidden discovery is timestamped and signed. When the final bill comes, there are no surprises.
Discover Issue
Bad footing, rock, or material upgrade
Document On-Site
Photo + scope + price in SealedScope
Send to Client
Text or email with one tap
Client Signs
Digital signature in seconds
Resume Work
Build with full authorization
76%
of masonry projects uncover footing issues, subsurface surprises, or material upgrades after work begins
$11,200
average annual loss per masonry company from undocumented extras and hidden structural work
3 min
average time to create, send, and get a change order signed with SealedScope
Join masons who use SealedScope to document every footing repair, material upgrade, and hidden surprise before it becomes a dispute. Free to start. No credit card.
Get Started FreeYour first 3 change orders are free. No strings attached.