Lock it down before you swing
Legally binding. No excuses.
When they try to skip the bill
Your whole crew covered
Know where every dollar went
When Things Go Wrong
Client Won’t SignClient Won’t PayScope DisputeWork Without ApprovalCollections & LiensClient Damaged Your WorkPre-Existing IssuesPermit ProblemsSubcontractor DisputesCompare
vs Procorevs Buildertrendvs Jobbervs JoistSee all comparisons →Industries
Built for every trade.
Construction & Trades
General ContractorsMasonry & ConcreteWindows & DoorsSiding & ExteriorDemolitionFence InstallationDeck BuildingConcrete & PavingYou started tearing out the kitchen and found asbestos tile under three layers of flooring, lead paint on every trim piece, and a load-bearing wall where none was expected. SealedScope makes sure every hazmat discovery and structural surprise is signed before you swing another sledge.

You bid selective demo and find the walls are plaster over brick, not drywall over studs. Removal time triples and the dumpster fills twice as fast.
Asbestos, lead paint, or mold shows up mid-demo. Abatement requires licensed subs, containment, air testing, and disposal. None of which were in scope.
Client wants three extra rooms demoed 'while you're here.' Extra haul-off, more dumpster pulls, and double the labor. They expect the same price.
Asbestos in floor tile, pipe wrap, or popcorn ceilings. Lead paint on every trim piece and window sill. Abatement isn't optional and it requires certified contractors, containment, and air clearance testing.
Client adds rooms, outbuildings, or concrete flatwork to the demo scope after the project is underway. More labor days, more haul-off trips, and more dumpster pulls.
What looked like a non-load-bearing wall turns out to carry the second floor. Now you need a structural engineer, a temporary shoring plan, and a steel beam before anything else comes down.
Live electrical, active plumbing, or gas lines discovered inside walls marked for demo. You need to coordinate disconnects, rerouting, and inspections before proceeding.
Material volume exceeds the estimate. Plaster is heavier than drywall, concrete is heavier than wood. Extra pulls, overweight charges, and special disposal for hazardous waste.
Client wants specific fixtures, trim, or materials saved during demo. Careful removal, labeling, and storage takes significantly more time than straight destruction.
Found asbestos? Load-bearing wall? Open SealedScope, describe the issue, set the remediation price, and snap photos of what you uncovered.
Send the change order via text or email. Client sees the photos, the scope, and the cost. They sign digitally before any additional work begins.
Every hazmat discovery, scope expansion, and structural surprise is documented and signed. The final invoice is bulletproof.
Hit Surprise
Hazmat, structural, or scope addition
Document On-Site
Photo + scope + price in SealedScope
Send to Client
Text or email with one tap
Client Signs
Digital signature in seconds
Continue Demo
Tear out with full authorization
79%
of demo projects uncover hazmat, structural issues, or scope additions after work begins
$13,000
average annual loss per demo company from undocumented hazmat costs and scope expansions
3 min
average time to create, send, and get a change order signed with SealedScope
Join demo crews who use SealedScope to document every hazmat discovery, structural surprise, and scope addition before it becomes a billing dispute. Free to start. No credit card.
Get Started FreeYour first 3 change orders are free. No strings attached.