Features
Everything you need to protect your work.
Core Features
Lock it down before you swing
Legally binding. No excuses.
When they try to skip the bill
Your whole crew covered
Know where every dollar went
When Things Go Wrong
Client Wonβt SignClient Wonβt PayScope DisputeWork Without ApprovalCollections & LiensClient Damaged Your WorkPre-Existing IssuesPermit ProblemsSubcontractor DisputesCompare
vs Procorevs Buildertrendvs Jobbervs JoistSee all comparisons βIndustries
Built for every trade.
Construction & Trades
General ContractorsMasonry & ConcreteWindows & DoorsSiding & ExteriorDemolitionFence InstallationDeck BuildingConcrete & PavingYou showed up to hang board and found the framing is bowed, there's water damage behind the old drywall, and the client wants a Level 5 finish instead of Level 3. SealedScope makes sure every framing fix and finish upgrade is signed before you mud the first joint.

Framing is bowed, twisted, or out of plumb. You can't hang flat board on crooked studs without furring, shimming, or sistering. None of which were in the drywall bid.
Water damage, mold, or termite damage discovered behind the old drywall. The framing needs repair and treatment before new board goes up.
Client upgrades from a standard Level 3 finish to Level 5 smooth, or wants custom textures like knockdown, orange peel, or skip trowel. Each level adds passes and labor.
Bowed studs, twisted headers, or walls out of plumb. Furring, shimming, or sistering framing members to create a flat plane adds a full day of labor before any board goes up.
Moisture damage behind old drywall requires framing repair, mold treatment, and sometimes structural reinforcement before new board can be hung safely.
Client upgrades from Level 3 tape-and-texture to Level 5 smooth for accent walls or high-gloss paint. Each level adds skim coats, sanding passes, and drying time between coats.
Patching areas in an existing home requires matching the original texture: knockdown, orange peel, popcorn, or skip trowel. Texture matching is an art that takes extra time and skill.
Client adds soundproofing (double-layer board, Green Glue, resilient channel) or fire-rated assemblies. Each upgrade changes the board type, fastening pattern, and mud schedule.
Scope expands to include the garage, basement, or all ceilings when the original bid was walls only. Each addition is more material, more lifts, and more finishing days.
Crooked framing? Water damage? Open SealedScope, describe the work needed, set the price, and snap photos of what you found behind the wall.
Send the change order via text or email. Client sees the photos and cost, signs digitally before you start the additional work.
Every framing fix, finish upgrade, and scope addition is documented and signed. The invoice matches the agreement perfectly.
Discover Issue
Framing, water damage, or finish upgrade
Document On-Site
Photo + scope + price in SealedScope
Send to Client
Text or email with one tap
Client Signs
Digital signature in seconds
Resume Work
Hang and finish with authorization
72%
of drywall jobs uncover framing issues, water damage, or finish upgrades after the old board comes down
$7,800
average annual loss per drywall company from undocumented framing corrections and finish upgrades
3 min
average time to create, send, and get a change order signed with SealedScope
Join drywall crews who use SealedScope to document every framing fix, finish upgrade, and hidden surprise before it becomes a dispute. Free to start. No credit card.
Get Started FreeYour first 3 change orders are free. No strings attached.